Cathodic Protection Network
International
Groundbed 2
We have not visited this iccps and have no information about it's performance or settings. It will be necessary to carry out a groundbed profile and a ground potential survey with this TR switching over the zinc strip anode section.
This is because if there are sufficient charges in the ground to overcome the EMF of the zinc, then that is where the current will flow, protecting the zinc interfering with the 'AC mitigation'
Back to the groundbeds index page